Retrofit
Planning for performance
Four retrofit decisions that create avoidable lifecycle costs. By Andrew Goodwin, President of PPS
Rising energy costs, aging infrastructure, and increasingly stringent building-efficiency requirements are prompting building owners and developers to reconsider how their facilities operate. Retrofitting existing buildings can reduce operating expenses, improve reliability, and support sustainability goals. However, achieving lasting results requires looking beyond individual equipment upgrades to evaluate the infrastructure supporting the entire facility.
Retrofit scopes often prioritize equipment replacement because it is visible and easy to price. That can miss the dependencies that determine whether new equipment will perform as intended. At PPS, our field teams repeatedly encounter the same costly gaps: aging units kept in service beyond their economics, deteriorated ductwork left in place, controls expected to compensate for mechanical deficiencies, and underground capacity sized only for current demand. Each issue reflects the same mistake: fixing a component without assessing the system around it. The most effective time to address these gaps is before the scope is set, when four decisions can still prevent repeat costs and rework.
1. Know when repairs have become the expensive option
The repair ticket rarely captures the full cost of keeping an aging unit online. Factor in higher energy use, repeat labor and parts, downtime, and refrigerant availability. Many older units rely on refrigerants that have been phased out and are no longer sold. Over time, cumulative repair and operating costs can reach two or three times the price of replacement.
Make the decision against the total cost of continued operation, not the price of the next service call. If you’ re calling us out to the same unit year after year, you’ ve already paid for a new one. But replacing the unit is only half the decision if the ductwork serving it is still compromised.
2. Don’ t pair new equipment with deteriorated ductwork
A replacement unit connected to 30-yearold ductwork inherits the ductwork’ s failures. Insulation that has deteriorated or fallen away increases thermal loss; open joints leak supply air; and delivered airflow can fall short of design. The new unit may run longer to meet demand while occupants still experience uneven cooling.